Motorola OMPAC C-5 BGA
Removal and Replacement
The Motorola
OMPAC represents the state of the art in surface mounted IC chip
technology. Although it has some elements in common with traditional
leaded QFP and PLCC chip components, it is nonetheless significantly
different in some major ways. For example, the OMPAC chip's interconnects
to the circuit board are completely beneath the chip, as opposed
to being on the outer edges, as with a QFP or a PLCC.
The first illustration,
Figure 1, show a cut-away view of a typical OMPAC; Figure
2 shows a PLCC. Like other chip components such as PLCCs or
QFPs, it contains an integrated circuit (die) with connections to
the exterior so that it can be soldered (physically and electrically
connected) to a circuit assembly. Unlike other leaded components,
however, its connections to the circuit board or assembly are contained
entirely under the body of the chip and are made by a grid-like
array of solder balls, hence the term Ball Grid Array or BGA, the
proper term for this type of chip component.
Once installed,
BGAs have no outwardly visible connections to the board, but surprisingly,
they are relatively simple to remove and replace using the correct
procedures with the appropriate equipment. In addition, the BGA
chip itself has very little mass compared to other components of
comparable lead connections, like large QFPs, so they must be heated
and processed more gently and carefully than traditional large chip
components.
OMPAC chips
can be sensitive to moisture, and are therefore packaged, when new,
in sealed containers. When in service or exposed to the environment
for any length of time, the may absorb moisture, and if heated too
rapidly, can "popcorn" and delaminate. For defective OMPACs about
to be removed from a circuit board, this is not a concern; however,
new OMPACs should not be removed from their containers until ready
for installation. Table 1 shows the allowable time that different
components with different moisture sensitivity levels can be exposed
to air before baking is necessary prior to soldering.
Sometimes it
is desirable to remove a "good" OMPAC chip from a "bad" board, or
protect a "good" board and its other components-such as adjacent
OMPACs-from "popcorning" if it has been in a high-humidity environment.
In such cases, the circuit board should be pre-baked to drive out
any moisture prior to rework. A special nozzle for this purpose
has been designed for the Chipmaster, Motorola oven nozzle, part
number 01-80303E15. Otherwise, a temperature-controlled oven designed
for drying and baking circuitry will be adequate. The chart (Table
2) will show what baking times at 125° will yield process "windows"
during which time the OMPAC chip should be reworked: The controlled,
gentle heating ramp rate of the Chipmaster ensures that "popcorning"
or other thermally induced adjacent component damage will not occur
or be a concern.
Replacement
OMPACs readily self-align on their pads due to the surface tension
of the solder. As long as the OMPAC has been located with a fair
amount of precision and care, it will self-align once the solder
balls underneath become liquid, during heating. The circuit board
itself has been marked with guide lines to facilitate correct alignment
by the operator. Figure 3 shows the pattern of connection
for an OMPAC BGA, including alignment guides as marked on the circuit
board. The illustration shows how much misalignment is acceptable-much
more than would be allowable with a typical QFP. In addition to
the BGAs self-alignment qualities, the solder balls supplied with
the BGA provide the correct amount of solder for a perfect solder
joint, so no additional solder need be applied to the board prior
to replacement.
OMPAC Removal
Procedure
1. Flood the
area under the component or "chip" to be removed with wetting solution,
Motorola Part #66-80333 E73 prior to component removal using the
"eye dropper" found in the Motorola SMD ToolKit (Motorola Part Number
01-80303 E45); Figure 4 illustrates the correct application
method.
2. Set the temperature
control on the Chipmaster to 425°. Reset the timer to zero.
To set or change setpoint temperature, press the INDEX key on the
controller TWICE; then press either the "UP" or "DOWN" arrow to
reach the desired temperature (RED LED display). To do this, use
the "UP" arrow to increase; hold the button in to increase rapidly.
To increase temperature in one-degree increments, press the arrow
button in individual steps. The same procedure works for the "DOWN"
arrow button. Then press ENTER. Press the INDEX key one more time
to return to the operational menu.
3. To reset
the timer to zero, press the ENTER key and the "DOWN" arrow key
simultaneously. The display will flash once, indicating that the
timer has been reset to zero.
How the Timer
Works: When the specific time has been set, e.g., 60 seconds,
the Chipmaster's timer counts down to zero once the foot pedal to
start the heating cycle is depressed. The timer will stop at zero,
even if the heating continues (foot remains on the pedal). If the
timer is reset to zero, it will begin counting UP once the heating
cycle begins and will STOP counting once the cycle is stopped by
the operator (foot pedal released). The timer will display the cycle
time (e.g., 45 seconds). Each time the foot pedal is depressed to
start the cycle thereafter, the timer will count DOWN to zero from
whatever that cycle time (in this example, 45 seconds) was recorded.
The procedure for changing cycle time is similar to setting temperature.
4. To Set Time:
Press the INDEX key ONCE (from the operational menu) to reach the
timer set menu. Use the "UP" arrow key to increase time in one-second
increments; hold the button down to increase rapidly. Once the time
is set, press ENTER; then press the INDEX key TWICE to return to
the operational menu.
5. Install the
appropriate nozzle in the Chipmaster. The nozzle orifice should
be only slightly larger than the chip itself. Center the chip under
the nozzle as shown in Figure 5. Be sure to observe vent
and height positioning as shown in Figure 6.
6. Depress the
foot pedal to begin the heating cycle. Note that the GREEN display
will begin "counting" the seconds while heating. The RED display
will indicate the heated air temperature as it ramps.
7. Turn on the
vacuum pump, then depress the vacuum pickup assembly to capture
the chip. The chip will not, however, lift off at this time.
CAUTION:
After removal, do not touch or move the chip!
8. After 40-60
seconds of heat application, observe the vacuum pickup assembly.
It should lift up automatically with the chip held be the suction
cup. This lift-off indicates that the chip has been successfully
removed.
9. Remove the
board holder arm assembly from under the nozzle, but DO NOT turn
off the vacuum or move the chip.
10. Leave the
chip in position until the RED LED temperature indicator (nozzle
temp.) drops to 300°F.
11. Using tweezers
in the Motorola SMD Tool Kit, grad the cooled chip and turn off
the vacuum pump, using the switch on the front of the Chipmaster.
Replacement
Prep
The OMPAC chip
is supplied with solder balls, engineered to make perfect solder
joints. No additional solder need be added to the pads; however,
leftover solder on the pads/board must be removed completely, and
the pad should be smooth, clean and tinned.
1. Use a soldering
iron in conjunction with the wick gun-Motorola part number 66-80333E70
(as shown in Figure 7) to remove all residual solder from
the pads of the chip area leaving clean and tinned pads. Do not
use excessive heat or pressure, because pad damage and/or removal
could result. If the pads are not smooth and shiny, use the hot
air reflow procedure which follows to clean them. If the pads are
acceptably clean and ready for reattachment, add a drop or two of
the wetting solution directly on the pad area and proceed to the
Replacement Procedure.
1a. If OMPAC
replacement IMMEDIATELY follows removal of a chip, the skip this
step, as pad prep and cleaning to remove oxidation is unnecessary.
Otherwise, use the Prep Pen (Motorola Part Number 66-80333E75)
supplied with the SMD Tool Kit to clean the pad area, as shown
in the illustration. Then, using the IPA Cleaning Solution from
the tool kit, continue to clean the area, being careful not to
damage the pads by rubbing too hard or vigorously.
1b. After
cleaning, place a few drops of wetting solution on the cleaned
pads.
Replacement
Procedure
1. hot air level
the pads if needed. In most instances, sufficient tinning will remain
on the pads to attach a new chip; but the surface may be rough,
uneven, or have solder "icicles", making accurate placement of a
new chip difficult. To hot air level, first place a drop or two
of wetting solution on the pads. Then depress the foot pedal of
the Chipmaster to initiate the heating cycle. The GREEN display
will begin counting DOWN to zero. The solder will melt and become
smooth; the solder should cover the pads completely and have a shiny
appearance.
2. Remove the
board and board holder assembly from beneath the Chipmaster nozzle
(depress cylinder, slide holder and board out). Let the board cool
to ambient temperature.
3. Next, apply
a thin layer of no-clean flux paste to the OMPAC bonding area, so
that the paste is evenly brushed and spread over the approximately
1/2 square area as shown in Figure 8. Pick up a replacement
chip using the aforementioned tweezers from the SMD Tool Kit then
place and center the OMPAC chip on the pads, within the boundaries
of the registration lines marked on the board (again, refer to Figure
3). Make sure the chip has been placed as accurately as possible
and the outer edges of the package are in proper registration with
the site.
4. Carefully
place the board under the Chipmaster and align the OMPAC chip with
the bottom of the nozzle in the same manner as was done for removal.
Center the component under the nozzle as accurately as possible.
5. Press the
INDEX key on the Chipmaster controller ONCE and verify or enter
the appropriate cycle time. The appropriate cycle time for reinstallation
is the same as the removal time plus 30 second, to ensure good solder
wetting.
a) Press ENTER;
cycle time is recorded in the memory-depress the foot pedal to
review;
b) Press the
INDEX key TWICE to return to the Main Menu.
6. Depress the
foot pedal to begin the heating cycle, hold down until the timer
reaches zero.
7. Release the
foot pedal to end the heating cycle and, after the RED temperature
LED indicates 140°F, remove the board from the Chipmaster work
area.
|